国内精品久久人妻无码网站,亚洲视频在线观看免费视频,国产亚洲欧美另类一区二区三区,成人福利国产一区二区,亚洲人成18禁网站,日韩在线精品人妻,都市激情 在线 亚洲 国产,综合欧美日韩一区二区三区
      Plastic Formwork
      US$43.00-45.00 / Square Meter
      • Recommend for you
      • What is Lianggong Aluminum Modular Telescopic Multi Prop for Construction
      • What is Reinforced Steel Frame Formwork Panels: Unmatched Stability for High-Rise Building Core Walls
      • What is Yancheng Lianggong Formwork Aluminum Trench Shoring Box

      What is Customized Adjustable Modular Retaining Round Plastic Formwork for Walls Slabs Columns Building Construction

      About this Item
      Details
      Company Profile

      Price

      Purchase Qty. Reference FOB Price

      100-499 Square Meters US$45.00

      500+ Square Meters US$43.00

      Sepcifications

      • After-sales Service Online Technical Support
      • Warranty 1 Year
      • Type Wall Formwork
      • Transport Package Standard
      • Specification ABS+Fiberglass
      • Trademark Lianggong
      • Origin Jiangsu, China

      Product Description

      Product Description Plastic Formwork Brief Introduction Plastic Formwork is a new material formwork system made from ABS and fiber glass. It can produce round columns with 1500 x 2400 950 x 2400 600 x 2400 150/600 x2400,etc. They are easy to assembly and light in weight. Plastic formwork ...

      Learn More

      Plastic Formwork Comparison
      Transaction Info
      Price US$43.00-45.00 / Square Meter US$30.00-40.00 / Piece US$30.00-40.00 / Piece US$30.00-40.00 / Piece US$42.00-45.00 / Piece
      Min Order 100 Square Meters 1 Piece 1 Piece 1 Piece 1 Piece
      Payment Terms LC, T/T T/T T/T T/T T/T
      Quality Control
      Product Certification - ISO ISO ISO ISO
      Management System Certification ISO9001:2015 - - - -
      Trade Capacity
      Export Markets North America, South America, Europe, Southeast Asia/ Mideast, Africa, Australia, Domestic, Oceania Europe, East Asia(Japan/ South Korea) Europe, East Asia(Japan/ South Korea) Europe, East Asia(Japan/ South Korea) Europe, East Asia(Japan/ South Korea)
      Annual Export Revenue 7,272,436 USD - - - -
      Business Model ODM, OEM Own Brand, ODM, OEM Own Brand, ODM, OEM Own Brand, ODM, OEM Own Brand, ODM, OEM
      Average Lead Time Peak Season Lead Time: one month
      Off Season Lead Time: one month
      Peak Season Lead Time: one month
      Off Season Lead Time: one month
      Peak Season Lead Time: one month
      Off Season Lead Time: one month
      Peak Season Lead Time: one month
      Off Season Lead Time: one month
      Peak Season Lead Time: one month
      Off Season Lead Time: one month
      Product Attributes
      Specification
      After-sales Service: Online Technical Support;
      Warranty: 1 Year;
      Type: Wall Formwork;
      After-sales Service: Provide After Sale Service;
      Warranty: Provide After Sale Service;
      Material: Steel;
      Type: Beam Formwork;
      Steel: Q235/Q355;
      Finished: HDG;
      Delivery Term: 45 Days;
      Container: FCL/LCL;
      Function: Shoring System;
      Usage: Building Material/Construction;
      Formwork: Base Formwork/Climbing Formwork;
      After-sales Service: Provide After Sale Service;
      Warranty: Provide After Sale Service;
      Material: Steel;
      Type: Beam Formwork;
      Steel: Q235/Q355;
      Finished: HDG;
      Delivery Term: 45 Days;
      Container: FCL/LCL;
      Function: Shoring System;
      Usage: Building Material/Construction;
      Formwork: Base Formwork/Climbing Formwork;
      After-sales Service: Provide After Sale Service;
      Warranty: Provide After Sale Service;
      Material: Steel;
      Type: Beam Formwork;
      Steel: Q235/Q355;
      Finished: HDG;
      Delivery Term: 45 Days;
      Container: FCL/LCL;
      Function: Shoring System;
      Usage: Building Material/Construction;
      Formwork: Base Formwork/Climbing Formwork;
      After-sales Service: Provide After Sale Service;
      Warranty: Provide After Sale Service;
      Material: Steel;
      Type: Beam Formwork;
      Steel: Q235/Q355;
      Finished: HDG;
      Delivery Term: 45 Days;
      Container: FCL/LCL;
      Function: Shoring System;
      Usage: Building Material/Construction;
      Formwork: Base Formwork/Climbing Formwork;
      Supplier Name

      YANCHENG LIANGGONG FORMWORK CO., LTD.

      Diamond Member Audited Supplier

      Taishan Dongkuo Steel Structure Co., Ltd.

      Gold Member Audited Supplier

      Taishan Dongkuo Steel Structure Co., Ltd.

      Gold Member Audited Supplier

      Taishan Dongkuo Steel Structure Co., Ltd.

      Gold Member Audited Supplier

      Taishan Dongkuo Steel Structure Co., Ltd.

      Gold Member Audited Supplier