| Specification |
After-sales Service: Online Support;
Warranty: 1 Year;
Processing Material: Natural Ingredients;
Application: Pasta Noodle;
Customized: Customized;
Power Source: Electric;
Automatic Grade: Automatic;
Voltage: 380 V;
Equipment Inspection: Supportable;
Visit Reception: Supportable;
Power: 65 Kw-135 Kw;
Productivity: 100 Kg/H-300 Kg/H;
Material: SUS304;
|
Processing Material: Agronomic Products;
Application: Food and Industrial Field;
Customized: Customized;
Power Source: Electric;
Automatic Grade: Semi-Automatic;
Raw Material: Starch, Glucose or Molasses;
Product Name: Lysine Production Line Equipment;
Equipment Name: Lysine Fermentation Equipment;
Process: Fermentation;
Final Product: Lysine Sulphate or HCl;
Equipment Included: Fermentor, Membrane Filter, Evaporator;
Workers Qty: 30-35 Workers Per Shift;
Installation Time: 8-12 Months;
Capacity: 10000 to 100000tpy Output;
Construction Area: 4000-10000m2;
Key Equipment: Fluid Bed Dryer, Filter Press, Crystallizer;
|
Processing Material: Agronomic Products;
Application: Food and Industrial Field;
Customized: Customized;
Power Source: Electric;
Automatic Grade: Semi-Automatic;
Raw Material: Starch, Glucose or Molasses;
Product Name: Lysine Production Line Equipment;
Equipment Name: Lysine Fermentation Equipment;
Process: Fermentation;
Final Product: Lysine Sulphate or HCl;
Equipment Included: Fermentor, Membrane Filter, Evaporator;
Workers Qty: 30-35 Workers Per Shift;
Installation Time: 8-12 Months;
Capacity: 10000 to 100000tpy Output;
Construction Area: 4000-10000m2;
Key Equipment: Fluid Bed Dryer, Filter Press, Crystallizer;
|
Processing Material: Agronomic Products;
Application: Food and Industrial Field;
Customized: Customized;
Power Source: Electric;
Automatic Grade: Semi-Automatic;
Raw Material: Starch, Glucose or Molasses;
Product Name: Lysine Production Line Equipment;
Equipment Name: Lysine Fermentation Equipment;
Process: Fermentation;
Final Product: Lysine Sulphate or HCl;
Equipment Included: Fermentor, Membrane Filter, Evaporator;
Workers Qty: 30-35 Workers Per Shift;
Installation Time: 8-12 Months;
Capacity: 10000 to 100000tpy Output;
Construction Area: 4000-10000m2;
Key Equipment: Fluid Bed Dryer, Filter Press, Crystallizer;
|
After-sales Service: on Line Support;
Warranty: 3 Years for Tank;
Processing Material: Water,Malt,Hops,Yeast;
Application: Beverage, Beer;
Customized: Customized;
Power Source: Electric Steam,Gas,Direct Fire;
Automatic Grade: Semi-Automatic;
Material: SUS304 Stainless Steel;
Cooling Unit: Chiller with Glycol Tank;
Control Unit: Temp. Controller, HMI, PLC or Touching Screen;
Thickness: Inner:3-4mm, Exteior:2mm;
Dimension(L*W*H): Depending on Capacity;
Weight: Depending on Capacity;
Welding: Arc Argon Protection;
Brewhouse Heating: Steam Jacket , Electric Tube, Direct Fire;
After Sales Service: Installation and Equipment Commission;
Capacity: 300L Beer Brewery Equipment;
|